1.Background
With the development of photovoltaic industry, the capacity of village-level transformers and industrial power transformers and the installed capacity of photovoltaic projects are saturated in some areas.The power grid company requires the photovoltaic grid-connected system to be a non-backflow current generation system, which means that the electricity generated by the photovoltaic grid-connected system is consumed by the local load, and the excess electricity is not allowed to be sent to the upper power grid through the low-voltage distribution transformer in reverse direction.
Photovoltaic inverter in photovoltaic components will produce direct current into alternating current (ac), has the dc component and harmonic mixing, unbalanced three phase current, output power of uncertainty, such as the current basic didn't take effective management measures, therefore, when there is power to the utility grid, will generate harmonic pollution to power network, easy cause power grid voltage fluctuation and flicker, etc.,If there are many such power sources to transmit electricity to the grid, the power quality of the grid will be seriously degraded.Therefore, this kind of photovoltaic power generation system must be equipped with anti-backflow current facilities to prevent the occurrence of reverse power.
When the photovoltaic power generation is greater than the load demand, the inverse power will be generated.So we need instruments to determine that Inverter has power output, and then by the instrument through RS485 communication ** and inverter data interaction, adjust the inverter output power, so that its output power and power balance.
2.Project Overview
A photovoltaic power generation company in the Philippines contacted our company to look for anti-backflow current meters. After proper connection agreement, we will purchase ACR10R-D16TE from our company.
3.Anti-backflow detection meter
When the photovoltaic power generation is greater than the load demand, reverse power will be generated. Therefore, we need an meter to determine that the inverter has over-power output, and then the meter sends a ** through RS485 communication to interact with the inverter data to adjust the output power of the inverter to balance the output power and the electrical power.
4.Function
5.Wiring
6.Typical Connection
Bibliography
1.Solutions for enterprise micro-grid system
朱鹍,女,就职于安科瑞电气股份有限公司,主要研究方向为企业能源管控
词条
词条说明
朱鹍安科瑞电气股份有限公司 上海嘉定 202110摘要:近年来,农村配电台区总保护器的安装率、投运率、运行合格率逐步上升,农户家用漏电保护器的安装率、投运率也得到了广泛的普及。通过狠抓剩余电流动作保护器的管理,取得了成效,通过保护器普遍的投运安装,农电触电伤亡事故大大减少,农村供电可靠性明显提高,农电设备健康状况明显好转,农村低压线损下降显著。关键词:
朱鹍安科瑞电气股份有限公司 上海嘉定201801 摘要:在日益增长的电力负荷需求下,为电力系统的配变电,需要对10 kV环网柜电缆接头的温度进行监测,解决因电缆接头温度过高而导致故障的问题。文中针对此问题,提出了基于单片机的利用非接触式传感器对电缆接头进行温度在线监测的方法。在设计中,该方案具体使用红外摄像头与声波模组,还使用电压电流测量模组进行辅助测量。根据相关函数关系由所得数据
摘要:为了解决原有电力监控系统存在的通信混乱、传感器采集速度慢、数据集中处理能力较差等问题,对煤矿电力监控系统进行了设计,即对电力系统地面主站调度监控系统、井下电力监控分站和矿用综合保护测控装置进行了设计,并对其运行原理进行了分析,解决了通信混乱、传感器采集速度慢、数据集中处理能力差等问题,为其他煤矿电力监控系统的设计提供了一定的参考,也为煤矿电网的稳定运行做出了一定的贡献。关键词:电力监控;传感
摘要:随着物联网、大数据、云计算以及移动互联网技术的应用,系统信息化建设发展,但后勤体系信息化建设相对滞后。现有的后勤体系信息化建设方案多倾向于数字化与信息化建设,缺乏对信息的综合处理、深度挖掘与联动应用。智慧医院能源管理系统着眼于能源一体化管理,包含能源经济性管理和性管理两方面内涵。能源经济性管理从能源分类分项管理、能效tisheng、能源结构优化着手,逐步调整医院用能结构,从而tisheng用
公司名: 安科瑞电子商务(上海)有限公司
联系人: 王子锋
电 话:
手 机: 15000353138
微 信: 15000353138
地 址: 上海嘉定嘉定育绿路225号
邮 编:
¥770.00
¥7200.00
¥280.00
安科瑞远程预付费系统Acrel-3200 先付费后用电 远程管理
¥150000.00
¥500.00
¥32000.00